Patons® ColorWul™ Cable Textures Cowl (Knit)

Knit a stylish cowl using Patons® Colorwul™, a wonderful 100% wool yarn that is available in fashion forward colours. You can complete this textured cowl in about 16 hours.

Designed by the Patons® Design Team.

Skill Level: Intermediate

 
 

Craft Time: varies

Uses Recycled Items: No

Keywords: C_33715, july2013, patons, colorwul, cable, textures, cowl, knit, pattern, free, knitting, intermediate

Materials

  • Patons® Colorwul™ (3 oz./85 ga.; 90 yds./81m) Yarn – Bramble (2 Balls)
  • Circular Knitting Needle, size U.S. 10½ (6.5mm) 20" (50cm) long or Size Needed to Obtain Tension
  • Cable Needle
Added to Printable List Your item has been removed from the list Click here to view the list

Instructions

Measurements: Approx. 9½" (24cm) high x 26" (66cm) around

Tension: 14 sts and 19 rows = 4" (10cm) in stocking stitch

 

ABBREVIATIONS

approx= approximately
Cr8B = slip next 4 stitches onto cn and leave at back of work. K4, then (K1. P1) twice from cn.
Cr8F = slip next 4 stitches onto cn and leave at front of work. (K1. P1) twice, then K4 from cn.
k= knit
k2tog= knit next 2 stitches together
m1= make 1 stitch by picking up horizontal loop lying before next stitch and knitting into back of loop.
p= purl
pat= pattern
rep= repeat
rnd(s)= round(s)
st(s)= stitch(es)
T8B = slip next 4 stitches onto cn and leave at back of work. (K1. P1) twice, then K4 from cn.
T8F = slip next 4 stitches onto cn and leave at front of work. K4, then (K1. P1) twice from cn.

Instructions

Cast on 96 sts. Join in rnd, placing a marker on first st.

1st rnd: *K2. P2. Rep from * around.

2nd to 4th rnds: Rep last rnd for (K2. P2) ribbing 3 times more.

5th rnd: *K6. M1. Rep from * around. 112 sts.

Proceed in Cable Pat as follows:

1st rnd: *(K1. P1) twice. K8. (K1. P1) twice. Rep from * around.

2nd rnd: *(P1. K1) twice. K8. (P1. K1) twice. Rep from * around.

3rd and 4th rnds: As 1st and 2nd rnds.

5th rnd: *Cr8B. Cr8F. Rep from * around.

6th rnd: *K4. (P1. K1) 4 times. K4. Rep from * around.

7th rnd: *K4. (K1. P1) 4 times. K4. Rep from * around.

8th to 17th rnds: Rep 6th and 7th rnds 5 times more.

18th rnd: As 6th rnd.

19th rnd: *T8B. T8F. Rep from * around.

20th rnd: As 2nd rnd.

21st to 28th rnds: Rep 1st and 2nd rnds 4 times more.

Rep these 28 rnds for Cable Pat until work from beg measures approx. 8½" (21.5cm), ending on a 4th rnd of pat.

Next rnd: *K5. K2tog. Rep from * around. 96 sts.

Work 4 rnds in (K2 P2) ribbing. Cast off in ribbing.